This time, Pustynnoye was supplemented with new facilities to process ore from Dolinnoye mine.
A new 220kV substation was to be built due to increased loads on the existing power grid and anticipated expansion of production. In addition, a number of hydraulic facilities were designed and built, including a new containment pond and tailings storage facility (TSF).
This time, Pustynnoye was supplemented with new facilities to process ore from Dolinnoye mine.
A new 220kV substation was to be built due to increased loads on the existing power grid and anticipated expansion of production. In addition, a number of hydraulic facilities were designed and built, including a new containment pond and tailings storage facility (TSF).
Construction of a crushing and screening complex
Crushed ore stockpile
Plant building with crushing, gravity concentration, reagents and other areas to operate the new plant
New 220kV substation
New containment pond
Tailings storage facility (TSF)