Pustynnoe Phase 1
2013-2014
Location
Kazakhstan, Karaganda region
Capacity
2 million tons of ore per year
Client
АО АК "Алтыналмас"
00:00 / 00:00
The first phase of the plant’s design and construction was implemented from 2013 to 2014
The process was based on hydrometallurgical ore processing, i.e. cyanide leaching.
The design and construction phase complied with all legal requirements regarding industrial safety and environment protection were observed during.
The first phase of the plant’s design and construction was implemented from 2013 to 2014
The process was based on hydrometallurgical ore processing, i.e. cyanide leaching.
The design and construction phase complied with all legal requirements regarding industrial safety and environment protection were observed during.
Project implementation
1.
Gold processing plant
2.
Crushing and screening area
3.
Conveyor transport
4.
110 kV electrical substation
5.
Mine infrastructure.
6.
Tailings storage facility (TSF)
7.
Tailings thickening and detoxification area
EPC
contract
silver
FIDIC book