Projects
Processing MMMF Aksu, Bestobe, Zholymbet
Project implementation: 2016-2018.
Capacity: 7 million tons of MMMF per year (total capacity of three plants)
Contract on development of a feasibility study and an EPC agreement.
Capacity: 7 million tons of MMMF per year (total capacity of three plants)
Contract on development of a feasibility study and an EPC agreement.
Pustynnoye Phase 1
Capacity: 2 million tons of ore/year
EPC contract
EPC contract
Pustynnoye Phase 2
Capacity: 2.5 million tons of ore/year
EPC contract
EPC contract
Akbakai
Capacity:
- 1.4 million tons of mature tailings and ore per year (phase 1);
- 1 million tons of ore per year (phase 2).
EPC contract
- 1.4 million tons of mature tailings and ore per year (phase 1);
- 1 million tons of ore per year (phase 2).
EPC contract
Zholymbet, Phase 2
Capacity: 2.5 million tons of ore/year
Engineering contract, detailed design stage.
Engineering contract, detailed design stage.
Dzherui
Capacity: 1.3 million tons of ore/year
EPC contract
Special construction conditions: inaccessibility of the site, difficult climatic conditions, highlands: altitude 2000 m above sea level.
EPC contract
Special construction conditions: inaccessibility of the site, difficult climatic conditions, highlands: altitude 2000 m above sea level.
Varvarinskoye
Capacity: 4.2 mln of ore/year.
ЕРСМ contract.
ЕРСМ contract.
Zhairem
Capacity: 5 mln of ore/year.
Contract for development of a feasibility study, FS (JORC 2012) and engineering stage P.
Contract for development of a feasibility study, FS (JORC 2012) and engineering stage P.
Aksu, Phase 2
Construction of 5 mln.TPA gold ore processing plant
Dzhamgyr
Throughput: 300 KTPA
Pustynnoye Phase3
"Increasing the throughput of the Processing Plant " Pustynnoye Phase 3" to 2.5 million tons of ore per year"